September 22, 2022 City Council Regular Meeting | |
Title 18. Authorize the City Manager to Execute a Contract for the Fell Street Drainage Basin Study with EMC Engineering (LOCAL) in an Amount Not to Exceed $125,000. The study will be used to determine how to optimize the two stormwater pump stations in the basin and to size a replacement for the 106-year-old concrete outfall that conveys discharge to the Savannah River. Fell Street is located in the West Savannah neighborhood. (Stormwater) | |
Strategic Priority Infrastructure | |
Description This contract is to conduct a Fell Street drainage basin study from EMC Engineering in an amount not to exceed $125,000. The study will be used to determine how to optimize the two stormwater pump stations in the basin and to size a replacement for the 106-year-old concrete outfall that conveys the Fell Street Pump Station discharge to the Savannah River. The study will include master planning for a replacement of the box culvert from Fell Street through Colonial Oil to the pump station and any other drainage improvements that may be needed in the basin. The improvements will be sized for a 100-year storm event.
The vendor is: S.S. EMC Engineering Services (27 Chatham Center S Drive A, Savannah, GA)(B) $125,000 A pre-bid conference was not conducted as this is a sole source procurement. (B) Indicates local, non-DBE-owned business. Local available: Yes Total sent: 1 Total received: 1 | |
Recommendation Approval | |
Contact Heath Lloyd, Assistant City Manager & Chief, Infrastructure and Development | |
Financial Impact Expenditure of $125,000 from the Capital Improvement Fund/Drainage Box Rehabilitations/SPLOST VI. | |
Review Comments | |
Attachments Exhibit 1: Funding Verification - Fell Street Drainage Basin Study.pdf Exhibit 2: Purchasing Notes - Fell Street Drainage Study.pdf |
|