Title 19. Authorize the City Manager to Execute a Contract for Design of the Savannah Springfield Canal with EMC Engineering, Inc. (Local) in the Amount of $546,559. First phase will Include widening the 100-foot bottom width. The improvements will be the first initial steps toward the Springfield Canal upgrades which will provide 100-year storm conveyance to the Savannah River outfall. | |
Strategic Priority Infrastructure | |
Description Recommend approval of a contract for the design of Savannah Springfield Canal with EMC Engineering, Inc.(Local) in the Amount of $546,559. Phase I of the Savannah Springfield Canal includes design for the widening to 100-foot bottom width of the canal from the railroad bridge crossing north of the new arena site to Highway 17 south on ramp from Louisville Road. The improvements will be the first initial steps toward the Springfield Canal upgrades which will provide 100-year storm conveyance to the Savannah River outfall. The City of Savannah's conceptual plan has identified a specific scope of proposed improvements to be completed within the Phase I project.
The funding for this request is from SPLOST. The method used for this procurement was the request for proposals (RFP), which evaluates criteria in addition to cost. The proposals were evaluated on the basis of qualifications and experience, project approach, proposed schedule, project team, local vendor participation, DBE/LDBE, and fees. This proposal was advertised, opened, and reviewed. Three proposals were received in response to this RFP. All proposals were reviewed and fully evaluated by a selection committee of City staff. Delivery: As needed. Terms: Net 30 days. The vendor is: L.B. EMC Engineering Services, Inc (Savannah, GA) (B) $546,559 Thomas & Hutton Engineering (Savannah, GA) (B) $715,550 Moffatt & Nichol, Inc. (Savannah, GA)(B) $800,537
A pre-proposal conference was conducted, and seven vendors attended. (B) indicates local, non-DBE owned business.
| |
Recommendation Approval | |
Contact Heath Lloyd, Assistant City Manager/CIDO | |
Financial Impact Expenditure of $546,559 from Capitol Improvement Fund | |