Description
This Change Order includes the additional equipment, labor, and materials required to convert Tenant Space 111 into an operations control center, reconfigure overhead power to serve demountable partitions within the operations offices, and modify fencing and temporary power to accommodate the new chiller pad. SAC Job ID 30565.
• Room 111 buildout - $325,519.33 (Non-AIP)
• Power reconfiguration-$23,497.13 (PFC eligible)
• Fencing relocation - $9,941.05 (PFC eligible)
|