Title 18. Authorize the City Manager to Execute a Contract for the Replacement of Two Pressurized Water Tanks with Pinholster Construction, LLC dba Pinco for an Amount of $283,250. The tanks store up to a combined total of 25,000 gallons of pressurized water for continuous efficient water distribution. (Industrial and Domestic Water Dept.) | |
Strategic Priority Infrastructure | |
Description This is a contract to procure two replacement hydropneumatic (pressurized water) tanks from Pinholster Construction, LLC dba Pinco in the amount of $283,250. The existing tanks were evaluated and determined to be near the end of their useful life (existing tanks are 40-50 years old). The tanks are being replaced to prevent service disruption and maintain a reliable water system. A 10,000-gallon tank at well #28 located on Whitemarsh Island and a 15,000-gallon tank at well #42 located in Southbridge are pressure tanks necessary for the water system to function properly. These tanks maintain pressurized water from the pump for gradual release into the water distribution system. By regulating system pressures, the hydropneumatic tanks provide more consistent water pressure to customers and minimize the occurrence of pressure surges.
The proposal was advertised, opened, and reviewed. Delivery, As needed, Terms: Net 30 days. The bidders were: The bidders were: Southern Civil, LLC (Townsend, GA) (D) $349,800 | |
Recommendation Approval | |
Contact Heath Lloyd, Assistant City Manager & Chief, Infrastructure and Development | |
Financial Impact Expenditure of $283,250 from the Capital Improvement fund/Water & Sewer Fund | |
Review Comments | |
Attachments Exhibit 1: Funding Verification - Hydropneumatic Tank.pdf Exhibit 2: Purchasing Notes - Hydropneumatic Tank.pdf |
|