Description
The Material Testing & Quality Assurance plans and specifications were sent directly to all eligible Testing Laboratories on our bidder’s list and posted directly to the Savannah / Hilton Head International Airport’s website for a period of two (2) weeks. Two bids were submitted, ECS Southeast, LLP being the low-cost bidder. The following bids were received:
BID TAB:
Firm/Contractor DBE/CID Total Amount Bid
ECS Southeast, LLP B/6 $40,760.00
Terracon Consultants, Inc. B/6 $58,625.00
Whitaker Laboratory, Inc. B/6 Non-Responsive
CAT Testing Labs, Inc. B/6 Non-Responsive
Applied Technical Services D/6 Non-Responsive
B: Local, Non-Minority D: Non-Local, Non-Minority
|