Previous Item Print Next Item

November 21, 2017 City Council Regular Meeting
Title
Motion to Award Sole Source Procurement of Engineering Services for Relocation of Water Line from Thomas and Hutton (Event No. 5623)
Description

Recommend approval to procure engineering services for the Brampton Road Connector from Thomas and Hutton in the amount of $475,400.00.

The Georgia Department of Transportation (GDOT) is planning to install a new rail spur and a new Brampton Road Connector from Burnsed Boulevard, running northeast and tying into Brampton Road. The new construction will be in conflict with the existing 48-inch Industrial and Domestic water line, necessitating the relocation of that line. The 48-inch water line is connected to the line along Jimmy DeLoach Parkway and Grange Road.

This is a sole source procurement because Thomas and Hutton has recently completed the 48-inch water line relocations for Jimmy DeLoach Parkway and Grange Road. Additionally, GDOT is requiring the City to submit the final relocation design for the water line no later than June 2018. Contracting with Thomas & Hutton will allow the City to complete the design in accordance with GDOT’s required deadlines and will prevent the duplication of work.

Thomas and Hutton has proposed a minority business enterprise (MBE) participation rate on this project of 13 percent, which matches the rate of previous water line design work completed by Thomas and Hutton at Grange Road and Jimmy DeLoach Parkway. 

 

Engineering design costs will be reimbursed by GDOT through a preliminary engineering agreement since the City has prior rights to these water lines,

Recommendation

Approval

Contact
Cesar Laureano, Water Resources
Financial Impact
$475,400.00
Review Comments
Attachments
Brampton Connector Purchasing Summary.pdf
Brampton Connector Funding Verification.pdf
Brampton Rd_MWBE Form.pdf
Agenda Plus