14. Authorize the City Manager to Execute a Contract for Generator Maintenance with Current Edge Solutions, LLC (LOCAL) in the Amount of $108,360. The generators provide emergency backup power to pump water at the City’s seven stormwater pump stations. Routine maintenance ensures systems are always in a ready state. (Stormwater)
Strategic Priority
Infrastructure
Description

This contract is to procure generator maintenance for Stormwater management with Current Edge Solutions, LLC in the amount of $108,359.21.

 

This contract is for generator maintenance for all generators in the Stormwater Management Division to include requirements for routine planned maintenance (RPM) and repair services for emergency power generation equipment, emergency power systems, switchgear, and other related equipment and components. The routine maintenance ensures that all pumping stations are in a ready state. The apparent low bidder was not selected due to failing to accurately diagnose problems with a generator during the previous contract they held with the City. Per the plant’s National Pollutant Discharge Elimination System permit, it is required that each plant have a backup power source in the event of an emergency.

 

The proposal was advertised, opened, and reviewed. The contract term expires on May 11, 2023. This contract also includes four available renewal options. Delivery: As needed. Terms: Net 30 days.

The bidders were:

L.B.      Power and Energy, Inc.  (Savannah, GA) (B) $78,135

02.       Current Edge Solutions, LLC (Savannah, GA) (B) $108,359.21

03.       W.W. Williams Company (Savannah, GA) (B) $131,330.00

04.       Yancy Bros. dba Yancy Power Systems (Pooler, GA) (D) $218,532.13


A pre-bid conference was conducted for this bid.
Local Available: yes
Total Sent: 351
Total Received: 4

(B) Indicates local, non-DBE business (D) Indicates non-local, non-DBE business.

Recommendation

Approval

Contact
Heath Lloyd, Assistant City Manager & Chief, Infrastructure and Development
Financial Impact
Expenditure of $108,359.21 from the General Fund/Stormwater Management/Equipment Maintenance.