Previous Item Print Next Item

June 10, 2021 City Council Regular Meeting
Title
9. Authorize the City Manager to Execute Two Contracts for Generator Maintenance with Cummins Power South and Yancey Caterpillar in the Amount of $131,105. 23 Generators Ranging from 75 to 1500KW will Provide Back-Up Power, Pumping 33,000 Gallons of Water per Day, at Seven Stormwater Pump Stations in the Event of an Emergency; Routine Maintenance Ensures Systems are Always in a Ready State.
Strategic Priority
Good Government
Description

Recommend approval for generator maintenance for Stormwater Management to Cummins Power South in the amount of $105,060 and Yancey Caterpillar in the amount of $26,045.

The contracts are for Cummins and Yancey Caterpillar generators throughout the City of Savannah. The Department recommends maintenance by factory-authorized service centers and technicians for each brand of generator. The contracts will address load bank tests on all generators once per year to ensure generators are performing as intended under full electrical load of the Stormwater Management Division.

Generator maintenance at stormwater pump stations around the City is critical and essential to the operations of drainage and flood mitigation. When the electric service goes out in a storm, the generators at these pump stations are the only way to maintain back-up power for continuous operations of these pumps in the event of an emergency. Routine maintenance inspections on each system ensures that the systems are always in a ready state.

The contracts are sole source because Cummins and Yancey Caterpillar are the manufacturers of existing equipment, and has the only manufacturer-certified technicians. The specified service technicians will provide critical maintenance to backup generators.

Recommend approval of contract in the amount up to $131,105.

Delivery As needed. Terms: Net 30 days

S.S. Cummins (Port Wentworth, GA) (D) $105,060.

S.S. Yancey Caterpillar (Pooler, GA) (D) $26,045.

(D) Indicates a non-local, non-DBE owned business.

Recommendation

Approval

Contact
Heath Lloyd, Chief of Infrastructure and Development
Financial Impact
Expenditure in the Amount of $131,105 from the General Fund
Review Comments
Attachments
Exhibit 1: Funding Verification - Generator Maintenance.pdf
Exhibit 2: Purchasing Notes - Generator Maintenance.pdf