January 11, 2024 City Council Regular Meeting
Title
22. Authorize the City Manager to Execute a Contract for Casey Canal Drainage Improvements with The Industrial Company (TIC) in an Amount of $40,276,019 using Budgeted SPLOST Funds Designated for this Project and Water & Sewer Enterprise Funds. The proposed construction work associated with this project are identified as Phase 2-1 (drainage system improvements along 54th Street between Atlantic Avenue and Harmon Street) and Phase 2-2 (drainage system improvements along 56th Street and 57th Street between Abercorn Street and Harmon Street). (Stormwater)
Strategic Priority
Infrastructure
Description

This contract is for the Casey Canal Drainage Improvements partial Phase 2-1 (drainage system improvements along 54th Street between Atlantic Street and Harmon Street) and full Phase 2-2 with The Industrial Company (TIC) in an amount not to exceed $40,276,019. The Casey South drainage basin has been experiencing recurring flooding issues in the Ardmore/Gould Estates/Olin Heights and Ardsley Park areas due to inadequate drainage pipe capacities. The Stormwater Management Division has decided to strategically approach project implementation with consideration given to minimizing the impact on resident’s daily lives. The proposed improvements associated with this project are targeted specifically to 56th and 57th streets, from Atlantic Street to Harmon Street, and 54th Street from Atlantic to Harmon. The Phase 2-1 project scope was reduced from Abercorn Street to Harmon Street to Atlantic Street to Harmon Street due to available funding challenges. The cost difference between the two firms is $9,800,003.

 

Additionally, this project will upsize/replace the existing lead-jointed water mains in the project area to comply with upcoming regulatory compliance requirements affecting the City Drinking Water System, as well as to enhance flow and water pressure for the neighborhood. Some project quantities were reduced, which lowered the overall cost. The bid was advertised, opened, and reviewed. Delivery: As needed. Terms: Net 30 days.

 

The bidders were:

The Industrial Company (Chatham County, GA )(D)    $48,496,632

Ruby-Collins, Inc (Smyrna, GA)(D)                             $58,296,635

 

A pre-proposal meeting was conducted and four (4) vendors attended. (A) Indicates local, DBE-owned business. (C) Indicates non-local, DBE-owned business. (D) Indicates non-local, non-DBE-owned business.

Local vendors notified via the supplier portal: Yes

Total sent: 566

Total received: 2

Recommendation

Approval

Contact
Zack Hoffman, Director, Stormwater Management Department
Financial Impact
Expenditure of $40,276,019 from the Capital Improvement Fund
Review Comments
Attachments
Exhibit 1: Funding Verification - Casey Canal Drainage Improvements.pdf
Exhibit 2: Purchasing Notes - Casey Canal Drainage Improvements.pdf
Exhibit 3: Map - Casey Canal 2A Capital Improvement Project Phase 2-1 and 2-2.pdf
Agenda Plus