February 28, 2019, City Council Regular Meeting
Title
35. Motion to Award Annual Contract for Surveying and Drafting Services to Coleman Company (primary contractor), EMC Engineering (secondary contractor), and Brewer Land Surveying (tertiary contractor) (Event No. 6782)
Strategic Priority
Infrastructure
Description

Recommend approval to award an annual contract for surveying and drafting services from Coleman Company (primary contractor), EMC Engineering (secondary contractor), and Brewer Land Surveying (tertiary contractor) in an amount not to exceed $50,000.00.  The surveying and drafting services will be used by various City departments and divisions to conduct property boundary surveys, plat preparation, topographic surveys, maps, utility surveys, tree surveys, construction layout surveys, as-built surveys, record drawings, and other services.

The method used for this procurement was the request for proposals (RFP), which evaluates criteria in addition to cost.  The criteria used for this RFP were proposer’s qualifications and experience, specific personnel experience, local vendor participation, and fees.

This project was not identified as an SBE project because the requirement of three certified SBEs could not be met at the time this bid was released.

The contract term shall be from February 28, 2019 through December 31, 2019.  After the initial term, there are two renewal options available.

Recommendation

Approval

Contact
Cristy Lawrence, Director of the Office of Capital Projects Management
Financial Impact
Expenditure of $50,000.00 from the General Fund and the Capital Improvements Fund (via Various Sources)
Review Comments
Attachments
Exhibit 1: Surveying Purchasing Summary.pdf
Exhibit 2: Surveying Scope.pdf
Exhibit 3: Surveying Scope Attachment A.pdf
Exhibit 4: Surveying Bid Tabulation.pdf
Exhibit 5: Surveying Funding Verification.pdf
Agenda Plus